| Review Type | Outcome | Est. Completion Date | Completed |
|---|---|---|---|
| Electrical Review | Approved | 11/30/2022 | 11/04/2022 |
| Electrical Review | Failed | 10/07/2022 | 09/21/2022 |
| Building Review | VOID/Not Required | 10/07/2022 | 09/16/2022 |
| Flood Review | Approved | 10/07/2022 | 09/14/2022 |
| Fire Review | VOID/Not Required | 10/07/2022 | 09/07/2022 |
| Planning Review | VOID/Not Required | 09/16/2022 | 09/02/2022 |
| Inspection | Outcome | Requested | Scheduled | Date Inspected |
|---|---|---|---|---|
| NOC Required | VOID/Not Required | 08/28/2024 | ||
| Sheila Denoncourt ((305) 664-6430) Send Email | ||||
| Electrical: Rough | Partial Pass | 9/4/2024 | 9/4/2024 | 09/04/2024 |
| Plans Examiner EL ((305) 664-6451) Send Email | ||||
|
Corrections:
Miscellaneous/Other
Carried Forward
09/04/2024
Partial pass, conduit only, and ground system for temporary generator. Request an electrical inspection when connecting the MTS to observe torquing of gear.
|
||||
| Electrical: Rough | Passed | 9/9/2024 | 9/9/2024 | 09/09/2024 |
| Plans Examiner EL ((305) 664-6451) Send Email | ||||
|
Corrections:
Miscellaneous/Other
Outstanding
09/04/2024
Partial pass, conduit only, and ground system for temporary generator. Request an electrical inspection when connecting the MTS to observe torquing of gear.
|
||||
|
Fire Correction
Outstanding
09/09/2024
Observed torquing of MTS
|
||||
| Planning Final | VOID/Not Required | 03/28/2025 | ||
| Evelyn Fraley ((305) 664-6436) Send Email | ||||
| Electrical: Final | Passed | 7/10/2025 | 7/10/2025 | 07/10/2025 |
| Plans Examiner EL ((305) 664-6451) Send Email | ||||
| Building: Final | Partial Pass | 8/21/2025 | 8/21/2025 | 08/21/2025 |
| Remote Inspector ((305) 924-0156) Send Email | ||||
|
Corrections:
Miscellaneous/Other
Carried Forward
08/21/2025
Pendng flood proofing certificate. Onsite inspection confirmed flood panel storage and pictures of panels installed. Brad Albright 305-619-9152
|
||||
| Building: Ground Slab Steel | Passed | 08/21/2025 | ||
| Remote Inspector ((305) 924-0156) Send Email | ||||
| Floodproofing Certificate | VOID/Not Required | 12/02/2025 | ||
| Sheila Denoncourt ((305) 664-6430) Send Email | ||||
| Building: Final | Passed | 12/02/2025 | ||
| Sheila Denoncourt ((305) 664-6430) Send Email | ||||
|
Corrections:
Miscellaneous/Other
Resolved
12/02/2025
Pendng flood proofing certificate. Onsite inspection confirmed flood panel storage and pictures of panels installed. Brad Albright 305-619-9152
|
||||
| Condition | Status | Category |
|---|---|---|
| Miscellaneous 1 (fill in)... | Notification | Building |
|
The wastewater buildings did not have to be ‘dry’ floodproofed for the grant. Therefore, the requirement for the dry floodproofing certificate was removed and an emergency action plan was created.
|
||