Permit Application Status
PRBLD202101224
| Review Type | Outcome | Est. Completion Date | Completed |
|---|---|---|---|
| Building Review | Failed | 03/31/2022 | 02/24/2022 |
| Flood Review | VOID/Not Required | 03/31/2022 | 02/24/2022 |
| Planning Review | Failed | 03/10/2022 | 02/24/2022 |
| Building Review | Approved | 11/04/2021 | 10/04/2021 |
| Electrical Review | Approved | 10/11/2021 | 09/14/2021 |
| Building Review | Failed | 10/11/2021 | 09/08/2021 |
| Flood Review | VOID/Not Required | 10/11/2021 | 09/08/2021 |
| Planning Review | Approved w/ Conditions | 09/20/2021 | 09/07/2021 |
| Inspection | Outcome | Requested | Scheduled | Date Inspected |
|---|---|---|---|---|
| NOC Required | Received | 11/12/2021 | 11/12/2021 | |
| Laurie Postrion ((305) 664-6433) Send Email | ||||
| Building: Final | Failed | 12/15/2021 | 12/15/2021 | 12/15/2021 |
| Plans Examiner ((305) 664-6432) Send Email | ||||
|
Corrections:
Miscellaneous/Other
Carried Forward
12/15/2021
A revision is needed for the 3000 lb lift. Location is not to plan.
|
||||
|
Miscellaneous/Other
Outstanding
12/15/2021
The two finger piers are not on the approved plans.
|
||||
| Electrical: Rough | Failed | 12/15/2021 | 12/15/2021 | 12/15/2021 |
| Plans Examiner EL ((305) 664-6451) Send Email | ||||
| Electrical: Final | Failed | 12/15/2021 | 12/15/2021 | 12/15/2021 |
| Plans Examiner EL ((305) 664-6451) Send Email | ||||
| Planning Final | Failed | 12/15/2021 | 12/15/2021 | 12/15/2021 |
| Heidi Harum ((305) 664-6421) Send Email | ||||
| Planning Final | Failed | 2/10/2022 | 2/10/2022 | 02/10/2022 |
| Heidi Harum ((305) 664-6421) Send Email | ||||
|
Corrections:
Planning Misc
Carried Forward
02/10/2022
No change. See previous comments.
Correction
|
||||
| Building: Final | Failed | 2/10/2022 | 2/10/2022 | 02/10/2022 |
| Philip Morretta ((305) 664-6425) Send Email | ||||
|
Corrections:
Miscellaneous/Other
Carried Forward
02/10/2022
A revision is needed for the 3000 lb lift. Location is not to plan.
|
||||
| Electrical: Rough | Passed | 2/10/2022 | 2/10/2022 | 02/10/2022 |
| Plans Examiner EL ((305) 664-6451) Send Email | ||||
| Electrical: Final | Passed | 2/10/2022 | 2/10/2022 | 02/10/2022 |
| Plans Examiner EL ((305) 664-6451) Send Email | ||||
| Planning Final | VOID/Not Required | 08/24/2022 | ||
| SysAdmin | ||||
|
Corrections:
Planning Misc
Outstanding
02/10/2022
No change. See previous comments.
|
||||
| Building: Final | VOID/Not Required | 08/24/2022 | ||
| SysAdmin | ||||
|
Corrections:
Miscellaneous/Other
Outstanding
02/10/2022
A revision is needed for the 3000 lb lift. Location is not to plan.
|
||||
| Condition | Status | Category |
|---|---|---|
| All docks with boat lifts, davits or similar lifting mechanisms shall provide cleats, rings, or similar features... | Open | Planning |
|
Planning
All docks with boat lifts, davits or similar lifting mechanisms shall provide cleats, rings, or similar features that can be used to tie down the vessel when it is out of the water in order to stabilize the vessel during high wind.
|
||
| Lift and vessel may not exceed more than 25% of width of canal | Open | Planning |
|
Planning
Lift and vessel may not exceed more than 25% of width of canal.
|
||
| Turbidity screen required for in-water work | Open | Planning |
|
Planning
Turbidity screen required for in-water work.
|
||
| When boat is attached to lift, no portion of the boat shall cross the property line | Open | Planning |
|
Planning
When boat is attached to lift, no portion of the boat shall cross the property line.
|
||
| The building permit number associated with the application shall be displayed on the sign | Open | Planning |
|
Planning
The building permit number associated with the application shall be displayed on the sign or sign structure, in a location visible from grade.
|
||
| The applicant or permit holder shall obtain all applicable state and federal permits prior to the start of | Open | Planning |
|
Planning
The applicant or permit holder shall obtain all applicable state and federal permits prior to the start of construction for the development authorized pursuant to this permit.
|
||
| No vegetation removal this permit. | Open | Planning |
|
Planning
No vegetation removal this permit.
|
||
| Adhere to conditions of previously issued ACOE & DEP permits | Open | Planning |
|
Planning
Adhere to conditions of previously issued ACOE & DEP permits
|
||
| No work permitted outside area indicated on approved site plan | Open | Planning |
|
Planning
No work permitted outside area indicated on approved site plan
|
||
| Maintain setbacks as shown. | Open | Planning |
|
Planning
Maintain setbacks as shown.
|
||
| No outdoor lighting this permit. | Open | Planning |
|
Planning
No outdoor lighting this permit.
|
||