| Review Type | Outcome | Est. Completion Date | Completed |
|---|---|---|---|
| Flood Review | Approved | 08/19/2019 | 08/08/2019 |
| Electrical Review | Approved | 08/19/2019 | 08/07/2019 |
| Building Review | Approved | 08/19/2019 | 08/05/2019 |
| Planning Review | Approved w/ Conditions | 08/05/2019 | 07/30/2019 |
| Inspection | Outcome | Requested | Scheduled | Date Inspected |
|---|---|---|---|---|
| NOC Required | Received | 8/27/2019 | 05/03/2021 | |
| Laurie Postrion ((305) 664-6433) Send Email | ||||
| ELECTRICAL: FINAL | Failed | 6/11/2021 | 6/11/2021 | 06/11/2021 |
| Plans Examiner ((305) 664-6432) Send Email | ||||
|
Corrections:
Miscellaneous/Other
Outstanding
06/11/2021
125 volt / 30 amp receptacle and cord cap were installed on a 250 volt 30 amp system.
|
||||
| BUILDING: FINAL | Passed | 6/11/2021 | 6/11/2021 | 06/11/2021 |
| Philip Morretta ((305) 664-6425) Send Email | ||||
| ELECTRICAL: FINAL | Passed | 6/16/2021 | 6/16/2021 | 06/16/2021 |
| Plans Examiner ((305) 664-6432) Send Email | ||||
| ELECTRICAL: OTHER | VOID/Not Required | 06/16/2021 | ||
| Plans Examiner ((305) 664-6432) Send Email | ||||
| PLANNING FINAL INSPECTION | Passed | 6/11/2021 | 6/11/2021 | 06/17/2021 |
| Ty Harris ((305) 664-6422) Send Email | ||||
| BUILDING: OTHER | VOID/Not Required | 06/23/2021 | ||
| Evelyn Fraley ((305) 664-6436) Send Email | ||||
| Condition | Status | Category |
|---|---|---|
| All docks with boat lifts, davits or similar lifting mechanisms shall provide cleats, rings, or similar features... | Resolved | Planning |
|
Planning
All docks with boat lifts, davits or similar lifting mechanisms shall provide cleats, rings, or similar features that can be used to tie down the vessel when it is out of the water in order to stabilize the vessel during high wind.
|
||
| Lift and vessel may not exceed more than 25% of width of canal | Resolved | Planning |
|
Planning
Lift and vessel may not exceed more than 25% of width of canal.
|
||
| Turbidity screen required for in-water work | Resolved | Planning |
|
Planning
Turbidity screen required for in-water work.
|
||
| When boat is attached to lift, no portion of the boat shall cross the property line | Resolved | Planning |
|
Planning
When boat is attached to lift, no portion of the boat shall cross the property line.
|
||
| No work permitted outside area indicated on approved site plan | Resolved | Planning |
|
Planning
No work permitted outside area indicated on approved site plan
|
||
| Maintain setbacks as shown. | Resolved | Planning |
|
Planning
Maintain setbacks as shown.
|
||
| Final Planning Inspection required. | Resolved | Planning |
|
Planning
Final Planning Inspection required.
|
||